Our Process
We’re committed to providing clients with a wide range of options, all with guaranteed quality and precision. From the beginning stages of the project all the way to the completion of the process, we work side-by-side with clients every step of the way.

Initial Meeting
60 Minutes - FREE
​
This is where we sit down and talk about the specifics of your site and our process. Based on the information we gather from your proposed site, such as potential setbacks, zoning, lot coverage details, environmental constraints and any other concerns. We’re able to select a plan that meets your needs and a template that satisfies your desires. We then take that plan and discuss any modifications or specific options you’d like to make your ADU a home, producing a timeline from start to finish. Take your proposal and get back to us; no pressure.
Permitting
1-9 Months - $2,000 Deposit
​
The permitting portion is taken care of entirely by Awesome ADUs. This phase consists of putting together your file, drawing the erosion control plan, site plan, and storm water conveyance plan. These documents are then assembled into a permit packet to be submitted to the jurisdiction, adjusting and resubmitting as needed. Our guarantee is that if a permit isn’t possible – we’ll refund you the difference.
​
Construction
3 – 5 Months | 25% deposit / 75% upon completion
​
Construction and legal inspection occurs entirely at our facilities, with 4 stages of construction / inspection occurring over a 4 – 5 week period.
-
Framing and all rough in of mechanical, electrical and plumbing.
-
Siding, roofing, sheet-rock taping and ceiling trim.
-
Final coat of sheet-rock mud, interior mill-work and painting.
-
Cabinet and counter-top installation, finish trim and touch-up.
​
Final Walk Through
Directly after completion of construction
​
Upon completion the house is now ready for a walk-through.​​
-
A final cleaning occurs and a hand off meeting is scheduled.
-
All documentation is left with the home and your warranty begins.